November 12th was the first Work Party day of the winter – a dry, sunny but cold day was ideal for getting those jobs done.  The Shed has been tidied up like never before, new decking outside the Container together with a hanging rail for wetsuits, new racks inside the Container, benches painted, jetties jet washed alongside many other jobs that needed doing.  Tea and cake enjoyed by all and followed by the Club Forum – report later.

 

 

Save

Save

Save